Malabar X Building Project
CWBW HOME MALABAR HOME
The hull is faired and several coats of clear sealer have been applied.
This is a lodging knee made of Angelique.
A lodging knee in place helps to spread mast and rigging strains over a wider hull area.
Up forward a look at the breast hook which ties the stem to the sheer clamps.
NEXT PAGE
Keel/ballast Transom Molds in place 4 5 6 Interior frame Deck beams 9 10 11
12 Prep for caulk The cockpit 15 Hull ready to paint Preparing the mast 18 19 20
The trailer Exiting the building Launch Day Sailing on Seneca Lake
Contact: Dennis Montgomery
Cayuga Wooden Boatworks
800.570.5335
6301 Water St. Cayuga, NY 13034 Voice: 315.253.7447
435 Taughannock Blvd. Ithaca, NY 14850 Voice: 607.272.1581 Fax: 607.272.1601
Email: dennis@cayugawoodenboatworks.com
[ Prev ] [ Random ] [ List ] [ Next ]
Webmaster - Web Design & Mgt by ASN Designs
Copyright 2002-2004 Cayuga Wooden Boatworks