Malabar X Building Project
CWBW HOME MALABAR HOME
Port garboard plank in place, the next strake is upside down in foreground.
Looking up at the planking coming down the hull
The end of the day, another plank in place.
We custom fabricated these bronze floors where the bilge water will sit.
A close-up of the laminated
transom frame where all the
ribbands and planking end.
Looking from starboard to port inside
planking; notice the copper rivets.
NEXT PAGE
Keel/ballast Transom Molds in place First Sheer Plank Putting planks in place Final Planks Interior frame Deck beams Lodging Knee Aft Deck framing in place Decking being sprung on King Plank Prep for caulk The cockpit Varnish Cockpit scupper/Interior Hull ready to paint Preparing the mast Finishing sanding the mast Engine controls/The Bilge/Interior
The trailer Exiting the building Launch Day Sailing on Seneca Lake
Contact: Dennis Montgomery
Cayuga Wooden Boatworks
800.570.5335
6301 Water St. Cayuga, NY 13034 Voice: 315.253.7447
435 Taughannock Blvd. Ithaca, NY 14850 Voice: 607.272.1581 Fax: 607.272.1601
Email: dennis@cayugawoodenboatworks.com
[ Prev ] [ Random ] [ List ] [ Next ]
Webmaster - Web Design & Mgt by ASN Designs
Copyright 2002-2004 Cayuga Wooden Boatworks