Malabar X Building Project
CWBW HOME MALABAR HOME
All molds are now in place with some ribs in view.
From inside looking out to port, more frames are visible.
Steam it, bend it, twist it, pound it, clamp it, fasten it -- one by one, ribs go into place.
The last ribs clamped in place, she begins to take shape.
Ribs & molds all in place.
NEXT PAGE
Keel/ballast Transom Molds in place First Sheer Plank Putting planks in place Final Planks Interior frame Deck beams Lodging Knee Aft Deck framing in place Decking being sprung on King Plank Prep for caulk The cockpit Varnish Cockpit scupper/Interior Hull ready to paint Preparing the mast Finishing sanding the mast Engine controls/The Bilge/Interior
The trailer Exiting the building Launch Day Sailing on Seneca Lake
Contact: Dennis Montgomery
Cayuga Wooden Boatworks
800.570.5335
6301 Water St. Cayuga, NY 13034 Voice: 315.253.7447
435 Taughannock Blvd. Ithaca, NY 14850 Voice: 607.272.1581 Fax: 607.272.1601
Email: dennis@cayugawoodenboatworks.com
[ Prev ] [ Random ] [ List ] [ Next ]
Webmaster - Web Design & Mgt by ASN Designs
Copyright 2002-2004 Cayuga Wooden Boatworks