Dowager Restoration
CWBW HOME DOWAGER HOME
Hot "Boat Glue", (pitch), is poured into bilge to provide leveling between frames for water.
Rudder, Strut and shaft log being fitted.
Port side. Hull primed and cabin varnish started.
Port side looking forward.
Inside the cabin:
Looking forward in forward cabin (before)
Looking forward in forward cabin (after)
Looking forward in aft cabin.
Starboard side, aft cabin.
NEXT PAGE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Near Completion Moving out of the shop Ready to Launch In the water
Contact: Dennis Montgomery
Cayuga Wooden Boatworks
800.570.5335
6301 Water St. Cayuga, NY 13034 Voice: 315.253.7447
435 Taughannock Blvd. Ithaca, NY 14850 Voice: 607.272.1581 Fax: 607.272.1601
Email: dennis@cayugawoodenboatworks.com
[ Prev ] [ Random ] [ List ] [ Next ]
Webmaster - Web Design & Mgt by ASN Designs
Copyright 2002-2004 Cayuga Wooden Boatworks